ProTex Environmental

Construction stormwater compliance & SWP3 preparation

ProTex Environmental, LLC's New Project Form

Project

TCEQ allows for 2 inspection schedules: every 7 days or every 14 days and after a 1/2" or greater storm event. Additional rain event inspections are now required for storm events that are multi-day and produce more than 1" of rainfall.

PROTEX CAN NOT PERFORM RAIN INSPECTIONS.

Site Conditions
Contractor
Site & Submitter Contact
Owner
Additional Information

Plan set: if the civil drawings / erosion control plans are available online, paste a shareable link below (Dropbox, Box, Google Drive, SharePoint, plan room, etc.). Please make sure the link does not require a login to open.

If you don't have a link, leave it blank and email the plan set to us after submitting.